Validation guide (Diablito)

WIKI OVERVIEW


Approval Requirements for the Diablito Check

Follow the Underwriting Criteria (Mainstream Valid Rules)

image.png

image-1709153217561.46.52 p.m..png

 

Process to Review and Approve/Reject the Diablito Check
      1. Open the Checklist Approvals from Retool and click the top priority option 
      2. Open the CFE bill.
      3. Check that it is no more than 120 days old. If not, reject  with notes of the situation.
      4. Check that the receipt holder and RPU written in OPS match the bill, if not
        • There must be a SS of the new RPU and CFE service name in case of “Alta y baja” on the lead notes
        • Check on lead notes for an EE explanation (ex. “El servicio es nuevo así que se usó los consumos de su casa anterior para hacer la PP”)
        • If there's nothing on lead notes, reject with notes of the situation.
      5. Go to the "Diablito Check" item, check there are the installed and contracted load by CFE info, if not reject with the note:
          “Faltan notas de carga instalada para saber si se considerarán costos extra de planeación”
      6. Go to the  Proposal Request section and check with the CFE bill
        • Check the consumptions, if they are not OK then identify the written VoBo of the customer for PP with estimated consumptions on the diablito check evidences, if there is nothing then reject with the note:

    “Casa Nueva / Recibo nuevo / PP con consumos estimados. Seguir wiki y obtener confirmación escrita del cliente: https://docs.google.com/document/d/1WQTkcvACEcDTHxhJ5Te1HxRW-t8O8n6lE0ZxqAyfd_w/edit#bookmark=id.n4qgj4v9hxp0 ¿Me apoyarían a subirlo a DIABLITO NOTES EVIDENCES por fis? 

    Template:

    Aprobación manual de diablito:

    Carga instalada subida (YES/NO)

    PP realizada con los consumos del recibo (YES/NO)

    Código postal correcto y sin viáticos o absorbidos por algún equipo (YES/NO)

    Tarifa en engine correcta (DAC, 01, 1A, 1B, etc) (YES/NO)

    Sistema con paneles ya instalados (YES/NO)

    Tiene fase muerta (YES/NO)

    Propuesta sobrepasa el 105% (YES/NO)

    DAC Buffer arriba de parámetros (YES/NO)

    Notas importantes o notes de special request:  


    New Houses, CFE Bills, and New Residency Approval Process and Consumption Estimation
    We can approve a project that is new construction or was recently moved into and thus has CFE billing period in the last 12 months of $0 in certain periods in the following scenarios and WITH written confirmation from the customer per this standard:

    New Construction Process:

    1. Size the system is sized using Bright calculator (link here and benchmarks here) which has the best practices for how to estimate consumption following best practices based on the various scenarios we encounter
    2. The sign off on this amount is given by the client with written confirmation that this is an estimation and the real consumption could be higher or lower and may result in additional cost if the system size needs to change (more below on how to do so).
    3. Have a written confirmation from the customer acknowledging that this size system assumes x kWhs per year consumption and if it turns out differently then they acknowledge their CFE bill will be higher and they may need additional solar at additional cost, 

    IMPORTANT: This written confirmation can be done via mail or whatsapp. Please DO NOT request a signature from the client, just a confirmation of the previous statement.

    1.  

        Revision #25
        Created 23 September 2023 18:28:17 by Hector Vargas
        Updated 27 June 2024 20:13:43 by Eduardo Alcantara